Procter House, London

Date : 2014.09.01
Tag:

This project was completed out of hours and involved the strip out of 6 floors. DMC salvaged 55 tonnes of computer flooring for re-use elsewhere off site and removed 72 bins of reusable recycled waste.
The total of re-used materials for recycling was 259.2 tonnes the contents of all this were removed via a 6 man lift within time and budget.