DMC has successfully carried out two phases of enabling works at 12 Golden Square. This building was planned to be fully refurbished back to Cat A standard and required enabling works to be carried out prior to the main contractor reinstating the building ready for new tenants.

These enabling works were extensive and DMC was responsible for installing temporary fire alarms,